For situational awareness

An overall view of "For situational awareness" realisation.

Realization of For situational awareness

Business processes

Situation awareness need support of several subprocesses/functions.

situation awareness functions

Products

Each product represents a business requirement specification.

ACE Open Loop and Imbalance forecast

product brs ace ol Imbalance forecast

Status information

product brs status information

TSO-TSO Data Exchange

product brs tso tso data exchange

Realization of the target and message objects

For situational awareness

Realisation of the target and message objects

For situational awareness

Message implementation Guides

Message Implementation Guidelines (MIGs) should be read in accordance with BRS and entry criteria to deliver an expected compliant solution.

Important clarifications and useful definitions that apply to all messages can be found here:

Message Parts

As a result of work done with deliverable B’s business requirements, it has been decided to divide the ACE Open Loop into three message parts, ACE OL Point value, ACE OL Historic message and ACE OL Limits messages.

The prototype will also include another message, Imbalance Forecast.

All messages are based on a semantic data model and do not necessarily provide guidance on which syntax / technology to use.

  • ACE OL Point value is designed to minimize message size to meet the 10-second resolution (AO-BR-2) and data in real time (AO-BR-3) requirements and consequently to not include a large overhead of information that need to be processed and transported. To support a message with little overhead and the business quality requirement it has been made a new document "ACEOL_MarketDocument" that this message is based on.

  • ACE OL Historic is made to meet the requirements to obtain historical data (AO-BR-4 and AO-BR-5). This message is based on "ACEOL_MarketDocument".

  • ACE OL Limits is made to meet the requirements Limits (AO-BR-6). This message is based on "Schedule_MarketDocument".

  • Imbalance Forecast is based on "EnergyPrognosis_MarketDocument".

This is the selected message parts and how they are exchanged:

4cee1da095f3702850c98f65705e1bd0

Message Definitions

Message definitions and document versions

Dataobject Document Schema version

Total Planned Flow-TSO

Schedule_MarketDocument

5.2

Planned Flow Power Plan Trade TSO
(ID+DA incl. Ramping).

Schedule_MarketDocument

5.2

Schedule_MarketDocument

5.2

Schedule_MarketDocument

5.2

Planned Flow mFRR TSO

Schedule_MarketDocument

5.2

Loop Transit solved in Planned Flow Agreed Supportive Power(ASP) TSO

Schedule_MarketDocument

5.2

Planned Flow Agreed Supportive Power(ASP) TSO

Schedule_MarketDocument

5.2

Planned Flow Replacement ReserveTSO

Schedule_MarketDocument

5.2

{planned-flow-afrr}

Schedule_MarketDocument

5.2

Planned Flow Period Shift-Adjustment TSO

Schedule_MarketDocument

5.2

Expected-countertrade-TSO

Schedule_MarketDocument

5.2

Measured

Measured Flow Point Value

measurementdata

0.8

Measured Flow Historic TSO

measurementdata

0.8

Capacity

Capacity Current NTC TSO

Capacity_MarketDocument

8.0

Capacity Day Ahead NTC TSO

Capacity_MarketDocument

8.0

Capacity Intraday NTC TSO

Capacity_MarketDocument

8.0

mFRR ATC AOF

Capacity_MarketDocument

8.0

Message Definitions

Message definitions and document versions

Dataobject Document Schema version

AggregatedActivations mFRR Balancing TSO

PlannedResourceSchedule_MarketDocument.

6.2

AggregatedActivations mFRR System TSO

PlannedResourceSchedule_MarketDocument.

6.2

AggregatedActivations mFRR Period Shift TSO

PlannedResourceSchedule_MarketDocument.

6.2

AggregatedActivations aFRR TSO

PlannedResourceSchedule_MarketDocument.

6.2

Plan FCR D Down TSO

PlannedResourceSchedule_MarketDocument.

6.2

Plan FCR D Up TSO

PlannedResourceSchedule_MarketDocument.

6.2

Plan FCR N TSO

PlannedResourceSchedule_MarketDocument.

6.2

Plan Production TSO

PlannedResourceSchedule_MarketDocument

6.2

Plan Production Adjustment TSO

PlannedResourceSchedule_MarketDocument

6.2

Plan Production Smoothing TSO

PlannedResourceSchedule_MarketDocument

6.2

Forecast Total Consumption

Schedule_MarketDocument

5.2

Forecast-Conform Load TSO

Schedule_MarketDocument

5.2

Forecast non-Conform Load

Schedule_MarketDocument

5.2

mFRR Period Shift TSO

ReserveBid_MarketDocument

7.2

mFRR Request TSO

ReserveBid_MarketDocument

7.2

Additional documents (not a part of this process)

mFRR Bid TSO

ReserveBid_MarketDocument

7.2(NBM)

Standard ACK

Acknowledgement_MarketDocument

8.1

Mutually Regulated Area - MRA

AreaConfiguration_MarketDocument

1.1

Message Definitions

Message definitions and document versions

Dataobject Document Schema version

mFRR Bid TSO

ReserveBid_MarketDocument

7.2

mFRR Activation TSO

Activation_MarketDocument

6.1