Home GitLab Teams - Fifty

Information models

    • Overview
      • Revision History
    • Business Processes
    • Business Requirement Specification
      • Entry Criteria
    • Message Implementation Guides
    • Attachments
    • Common guidelines and definitions
    • ECP Message Exchange Specification
Information models master
  • Information models
    • master
  • Information models
  • XML attachments

XML attachments

ACEOL

  • Historic

  • Limit

  • Point value

Acknowledge

  • Acknowledge

  • Acknowledge Rejected

Activation

  • aFRR

  • mFRR Balancing

  • mFRR System

  • Production Shift

AOF

  • mFRR ATC AOF

  • mFRR Bid AOF

  • mFRR Request AOF

  • link:_attachments/xml/aof/output/fi_flow_A30.xml [Flows AOF]

  • Net Positions AOF

  • link:_attachments/xml/aof/output/fi_price_B24.xml [Price AOF]

  • mFRR Remaining ATC AOF

Bid

  • Technical Link Bid

  • Simple Bid

  • Exclusive Bid

Flow

  • Intraday

  • Day ahead

  • Current NTC

  • Current mFRR ATC

  • Historic measured flow

  • Point value measured flow

  • Agreed supportive power

  • Day Ahead

  • Expected Counter Trade

  • Intraday

  • Loop Transit Product

  • mFRR

  • Period Shift Adjustment

  • Power Plan Trade

  • Replacement Reserve

  • Total Planned Flow

Forecast

  • Total Consumption

  • Conform Load

  • Non-conform Load

Imbalance

  • Prognosis

mFRR-Request

  • TSO-TSO

  • TSO-AOF

Plan

  • Production Smoothing

  • Production Plan

  • Production Adjustment

  • FCR N

  • FCR D Up

  • FCR D Down

  • Planned Production

  • Planned mFRR Bid

Price

  • Price Direct Activation TSO

  • Price Scheduled Activation TSO

  • Imbalance Price

  • Cross Border Marginal Price

SuspendAOFResult

Remember to merge Status codes: urn-entsoe-eu-local-extension-types.xsd into your own version of this file. * NBM SystemStatus

Confirm OK

  • Confirmed SuspendAOFResult - Positive

Rejected AOF Result

  • Rejected SuspendAOFResult - Negative

For Planning Table Data

planning table
Figure 1. Simplified view of main data objects (which correspond to XSDs) to be used.
  • Planned Production

  • Total Consumption

  • Total Planned Flow